How can you know the impact of uprating and derating wind turbines?

Today, most OEMs offer uprating packages (GE PowerUp, Vestas PowerPlus, etc.) that allow for existing wind turbines to realize higher annual power production. The impact on reliability through derating or uprating is unknown through industry standard techniques. This has led to well under 20 year life of current wind turbine gearboxes.

Presenter

Presenter

Stephen Steen has been leading CBM system design and integration within the automotive and energy industries for over 10 years. Currently Stephen is tasked with bringing DigitalClone Live, a third generation prognostics based CBM system, to the energy and heavy machinery industry.