Results

Outcomes that move the P&L.

A sample of what teams measure after deploying DigitalClone® on their fleets and design programs.

85%
fewer unplanned downtime events
faster design iteration cycles
40%
lower lifecycle maintenance cost
10×
faster AM part qualification
+22%
platform readiness uplift
18 mo
earlier failure warning

Case studies

Wind Energy

Predicting main-bearing failure on a 1.2 GW fleet

Forecasted high-speed shaft bearing failure 14 months ahead of replacement, enabling fair-weather maintenance and avoiding two crane mobilizations.

Aerospace

Qualifying an additively manufactured engine bracket

Replaced 60% of planned coupon testing with validated microstructure and fatigue models, compressing the qualification timeline from 14 to 5 months.

Defense

Sustaining a legacy rotorcraft drivetrain

Component-level prognostics extended overhaul intervals on a fielded gearbox by 1,200 flight hours, lifting fleet availability by double digits.

Build the business case on your data.

Unlock Outcomes